Character Art Exchange

Pressure Gauge Of The Vertical Roller Mill

The inspection work before the debugging of the vertical roller mill is required to be meticulous and keep the equipment in good condition. The details are as follows: the sector block and bearing bush of the lower bearing seat should be aligned with the center line;

the large gear and the pinion should be aligned according to the instructions. The sector block of the lower bearing seat, the bottom plate of the pinion, the bottom frame of the main gear and the bottom frame of the motor are completely grouted, and the grouting strength meets the design strength requirements. All anchor bolts, connecting bolts and main gear pressing bolts should be tightened. The fixing bolts of the large gear should be tightened according to the specified torque. The bearing bush should be installed on the fan-shaped block of the bearing seat according to the rotation direction of the vertical roller mill;

The vertical roller mill is equipped with equipment for installation Completed, the grinding workshop system is complete;

The surrounding environment of the equipment is free of garbage and debris, and the scaffolding is removed;

Ensure that the water power, electricity, and communication facilities are complete;

Explosive materials, and equipped with corresponding fire-fighting facilities to prevent accidents;

Ensure that the amount of lubricant used during the operation of the vertical roller mill is sufficient;

You must be logged in to comment.

Register
Log in
Username

Password:

forgot your password?

or OpenID:
or Log in with Google