Equipment installation and construction: According to the process plan layout drawing and installation construction drawing, foundation drawing, Calcium Carbonate Plant contour size and mutual spacing, etc. required by the technical department, the basic construction and stone grinding machine should be placed in place. Unpacking acceptance: After the arrival of the new stone mill, the management department of the stone mill will, together with the purchase unit and the use unit (or receiving unit), carry out the unpacking acceptance and check whether the stone mill is damaged during transportation. Lost, attached, with
Machine spare parts. Whether special tools, technical materials, etc. are in agreement with the contract. The packing list is consistent, and the equipment unpacking acceptance form is filled out and stored in the equipment file. If there is any defect or non-conformity, it should be immediately dealt with, and requested or claimed.
The stone mill has low running cost and high milling efficiency: the grinding roller directly crushes the ground material on the grinding disc, and the energy consumption is low, saving energy consumption by 30% to 40% compared with the ball mill system; less wear: due to work The grinding roller is not in direct contact with the grinding disc, and the grinding roller and the lining plate are made of high-quality materials, so the service life is long and the wear is small; the stone grinding machine is equipped with an automatic control system, which can realize remote control and is easy to operate. It is equipped with a device to prevent direct contact between the roller sleeve and the disc liner, avoiding damaging shock and severe vibration. Due to the short residence time of the material in the grinding of the Vertical Roller Mill, it is easy to detect and control the particle size and chemical composition of the product, reduce the repeated grinding and stabilize the product quality.
Equipment installation and construction: According to the process plan layout drawing and installation construction drawing, foundation drawing, Calcium Carbonate Plant contour size and mutual spacing, etc. required by the technical department, the basic construction and stone grinding machine should be placed in place. Unpacking acceptance: After the arrival of the new stone mill, the management department of the stone mill will, together with the purchase unit and the use unit (or receiving unit), carry out the unpacking acceptance and check whether the stone mill is damaged during transportation. Lost, attached, with
Machine spare parts. Whether special tools, technical materials, etc. are in agreement with the contract. The packing list is consistent, and the equipment unpacking acceptance form is filled out and stored in the equipment file. If there is any defect or non-conformity, it should be immediately dealt with, and requested or claimed.
The stone mill has low running cost and high milling efficiency: the grinding roller directly crushes the ground material on the grinding disc, and the energy consumption is low, saving energy consumption by 30% to 40% compared with the ball mill system; less wear: due to work The grinding roller is not in direct contact with the grinding disc, and the grinding roller and the lining plate are made of high-quality materials, so the service life is long and the wear is small; the stone grinding machine is equipped with an automatic control system, which can realize remote control and is easy to operate. It is equipped with a device to prevent direct contact between the roller sleeve and the disc liner, avoiding damaging shock and severe vibration. Due to the short residence time of the material in the grinding of the Vertical Roller Mill, it is easy to detect and control the particle size and chemical composition of the product, reduce the repeated grinding and stabilize the product quality.